Skylight
๐ฅ Your quick reference guide to all Skylight financing options. Perfect for fast and accurate proposals.

๐ป Log in Link: Login | Skylight
Application Platform: Financing platform (non integrated)
Additional information can be found in: Lease Program Overview I Skylight Help Center
Design Platform: Aurora
Property Types ๐๏ธ๐
Type | Finance | EQ-Op |
Duplexes | โ๏ธ | โ๏ธ |
Triplexes | โ๏ธ | โ๏ธ |
1-4 Unit Multifamily Homes | โ๏ธ | โ๏ธ |
Condos | โ | โ |
Townhomes | โ๏ธ | โ๏ธ |
Vacation Homes | โ๏ธ | โ๏ธ |
Secondary Homes | โ๏ธ | โ๏ธ |
Mobile Homes | โ | โ |
In a mobile home park | โ | โ |
Manufactured Homes | โ | โ |
Modular Homes | โ | โ |
Farms/Agricultural Land | โ | โ |
Investment Properties | โ | โ |
Commercial Properties | โ | โ |
5+ Unit Multifamily Homes | โ | โ |
Roof must be owned, not shared | โ๏ธ | โ๏ธ |
Mulitiple System Financing | โ๏ธ | โ๏ธ |
Ground Mount | โ | โ |
Residential, Single Family Homes | โ | โ |
Detached Garage / Guest Suite | โ | โ |
Accessory Dwelling Unit (ADU) | โ | โ |
Carports / Pergolas | โ | โ |
Overhang Porches | โ | โ |
Add on Systems ๐ โกโ
Are add-on systems allowed? (Additional panels tied into the same inverter & meter) | โ Not acceptable |
Are second (2nd) systems allowed? (New system containing new inverter(s), tied to the same meter. A 2nd system, physically separate from any pre-existing solar on site, but tied to the same meter/account) | โ ๏ธ Acceptable only if certain conditions are met |
Special Requirements: 1. Minimum 3 kWย add-on system size / 2. Separate permittingย from the existing system / 3. Separate monitoringย from the existing system / 4. Minimum 12 inches of separationย from existing arrays โ photos required for NTP / 5. Add-on projects are not permitted on properties that already have an existing battery storage system installed. | |
Are separate systems allowed? (A separate/new system connected to a different electric meter, on a different utility account, unrelated to any existing solar systems) |
Notes:
*Second systems must include a Tesla inverter if you add any Enphase inverter an adder of $650 will apply.
โ ๏ธ As the installer, we reserve the right to accept or decline any project described in this section that may involve the modification or intervention of a previously installed system, or that may result in non-compliance with any of the standards established by the financing company.
Pricing Details ๐ฐ
Minimum amount | $10.000 |
Maximum amount (total) | $100.000 |
Price Per Watt (PPW) Cap | โ
Max Cash Price: $4.50/W (Dealer fee can be added).
โ
Adders Allowed:
$5K Electrical Adder
$5K Battery-Only Lending
โ
Roofing Allowance: Solar price can be doubled for roofing.
Example: 10 kW system at $5/W โ $50K solar โ $50K additional for roofing |
Customer Requirements ๐ค
Borrower must be a resident | โ๏ธ |
Minimum FICO requirement | 660 |
Reporting bureau | Experian |
Initial credit verification | Soft |
Income Verification | Yes |
Co-signer allowed? | Only one borrower must be on the title.
โ
Accepted Co-Borrowers: A household member or an immediate family member living in the same state (parent, spouse, son, daughter, brother, or sister).
โ Not Accepted: Grandparents, uncles, aunts, or cousins. |
Credit Freeze | Customer will need to unfreeze |
Reverse Mortgage | โ |
DTI | Does not look at DTI |
ITIN (Individual Taxpayer Identification Number) | โ |
System Requirements โก
Maximum System Size | 45 kW |
Roofing Information ๐
There are no restrictions on roof types. |
Credit Extension ๐
Credit Expires | 90 days |
Allows Extension | No |
Extension Expires | No |
Max Number of Extensions | No |
Debt Requirments ๐
Bankruptcies | ๐ซ Last 3 years |
Foreclosure | ๐ซ Last 3 years |
Funding Details ๐ธ
First Payment Date | Skylight lease billing - starts on the 1st or the 15th of the month following pto. |
NTP (Notice to Proceed) Timeline | 1-2 Days |
Funding Timeline | We fund every monday/ wednesday/ and friday. |
M1 Commission By Equity Solar | โ๏ธ |
Loan Transferability | โ๏ธ |
Contract & Verification Process โ๏ธ
Spanish Agreement? | โ๏ธ |
Welcome Call | โ |
Cancellation Policy Timeline | 3 Days after signing |
Utility Companies ๐
FPL | โ๏ธ |
Duke | โ๏ธ |
City of Bartow Electric | โ |
City of Mount Dora | โ |
City of Vero Beach | โ |
Clay Electric Cooperative Inc | โ |
JEA | โ๏ธ |
Kissimmee Utility Authority | โ๏ธ |
Lakeland Electric | โ๏ธ |
Lee County Electric Coop Inc | โ๏ธ |
SECO | โ๏ธ |
TECO | โ๏ธ |
Glades | โ |
Withlacoochee | โ๏ธ |
City Of Winter Park | โ๏ธ |
FPUA | โ |
Orlando Utilities Commission | โ๏ธ |
Peace River Electric Coop (PREC) | โ |
City of Tallahassee (Your Own Utilities) | โ |
Gainesville Regional Utility (GRU) | โ |
๐ Financial institution contact information:
- Welcome Call: The welcome call is done via the online portal through a video welcome call, or call atย +1 (346) 597-1148ย after the agreement has been signed
- Contractor Support: (407) 922-6248 - (866) 471-6595
- Customer Service: (866) 471-6595
- Chat & Phone Support Hours: Monday โ Friday: 8:00 AM โ 5:00 PM Central Standard Time (CST)