LightReach
π₯ Your quick reference guide to all Lightreach financing options. Perfect for fast and accurate proposals.

π» Log in Link: Login | Palmetto
Application Platform: Enerflo (integrated)
Additional information can be found in: LightReach Energy Plan | Palmetto Installer Guides
Design Platform: Aurora
Property Types ποΈ
Type | Finance | EQ-Op |
Duplexes | β | β |
Triplexes | βοΈ | βοΈ |
1-4 Unit Multifamily Homes | βοΈ | βοΈ |
Condos | β | β |
Townhomes | β | β |
Vacation Homes | β | β |
Secondary Homes | βοΈ | βοΈ |
Mobile Homes | β | β |
In a mobile home park | β | β |
Manufactured Homes | β | β |
Modular Homes | β | β |
Farms/Agricultural Land | β | β |
Investment Properties | β | β |
Commercial Properties | β | β |
5+ Unit Multifamily Homes | β | β |
Roof must be owned, not shared | βοΈ | βοΈ |
Mulitiple System Financing | β | β |
Ground Mount | β | β |
Residential, Single Family Homes | βοΈ | βοΈ |
Detached Garage / Guest Suite | βοΈ | βοΈ |
Accessory Dwelling Unit (ADU) | βοΈ | βοΈ |
Carports / Pergolas | β | β |
Overhang Porches | β | β |
Add on Systems π β‘β
Are add-on systems allowed? (Additional panels tied into the same inverter & meter) | β Not acceptable |
Are second (2nd) systems allowed? (New system containing new inverter(s), tied to the same meter. A 2nd system, physically separate from any pre-existing solar on site, but tied to the same meter/account) | β οΈ Acceptable only if certain conditions are met |
Special Requirements: 1. Approved by Utility / 2. Does not interfere or impact pre-existing system NEM or value proposition for the customer in any way / 3. All second systems must have independent monitoring IDs separate from any existing system | |
Are separate systems allowed? (A separate/new system connected to a different electric meter, on a different utility account, unrelated to any existing solar systems) | βοΈ Acceptable, up to 3 systems per applicant. For all intents and purposes, these are simply new customers for LightReach, who may have multiple units/properties and want solar on each. Simply a new system with no connection to other system(s) owned by the applicant |
Notes:
*Second systems must include a Tesla inverter if you add any Enphase inverter an adder of $650 will apply.
β οΈ As the installer, we reserve the right to accept or decline any project described in this section that may involve the modification or intervention of a previously installed system, or that may result in non-compliance with any of the standards established by the financing company.
Pricing Details π°
Minimum amount | $20.000 |
Maximum amount (total) | $150.000 |
Maximum customer montly payment | $500 |
Price Per Watt (PPW) Cap | Varies, see LightReach pricing in tool |
Customer Requirements π€
Borrower must be a resident | βοΈ |
Minimum FICO requirement | 680 |
Reporting bureau | Experian & Transunion |
Initial credit verification | Soft |
Income Verification | Debt-to-Income (DTI) Not Factored |
Co-signer allowed? | Yes |
Credit Freeze | Unfreeze Equifax & Transunion |
Reverse Mortgage | β |
DTI | Does not look at DTI |
ITIN (Individual Taxpayer Identification Number) | β |
System Requirements β‘
Maximum System Size | No maximum system size is required |
Maximun offset | 150% |
Roofing Information π
πΉ Pitched Roofs (Sloped) | β Asphalt Shingle βCorrugated Metal βStanding Seam Metal |
πΉ Flat Roofs
| β EPDM, βModified Bitumen βRolled Asphalt / Comp β Stationary or tracking (must meet eligibility requirements) |
β Disqualified Roofs | Wood Shake, Tin Metal, Clay Tile, Slate, PVC or PTO, SPF, Metal Tile and Tar and Gravel. |
Credit Extension π
Credit Expires | Credit Valid 180 days from initail run and 160 days from the contract sign date. |
Allows Extension | Yes. case by case |
Extension Expires | Yes. case by case |
Max Number of Extensions | 1 |
Debt Requirments π
Bankruptcies | π« 7-year lookback |
Foreclosure | π« 7-year lookback |
Funding Details πΈ
First Payment Date | 30 days after PTO |
NTP (Notice to Proceed) Timeline | 2-4 Days |
Funding Timeline | 7-15 Days |
M1 Commission By Equity Solar | βοΈ |
Loan Transferability | βοΈ |
Contract & Verification Process βοΈ
Spanish Agreement? | βοΈ |
Welcome Call | β |
Cancellation Policy Timeline | β |
Utility Companies π
FPL | βοΈ |
Duke | βοΈ |
City of Bartow Electric | β |
City of Mount Dora | β |
City of Vero Beach | β |
Clay Electric Cooperative Inc | β |
JEA | βοΈ |
Kissimmee Utility Authority | βοΈ |
Lakeland Electric | βοΈ |
Lee County Electric Coop Inc | βοΈ |
SECO | βοΈ |
TECO | βοΈ |
Glades | β |
Withlacoochee | βοΈ |
City Of Winter Park | βοΈ |
FPUA | β |
Orlando Utilities Commission | βοΈ |
Peace River Electric Coop (PREC) | βοΈ |
City of Tallahassee (Your Own Utilities) | βοΈ |
Gainesville Regional Utility (GRU) | βοΈ |
π Financial institution contact information:
- Welcome Call: No welcome call β verification via email
- Contractor Support: Text βINSTALLERβ to 888-531-3327 (Certified Installer support)
- Customer Service: 855-339-1831
- Chat & Phone Support Hours: Monday β Friday: 9:00 AM β 12:00 AM / Saturday: 10:00 AM β 8:00 PM / Sunday: 10:00 AM β 5:00 PM