EnFin

๐Ÿ–ฅ Your quick reference guide to all EnFin financing options. Perfect for fast and accurate proposals.

Notion image

๐Ÿ’ป Log in Link: Login | EnFin

Application Platform: Aurora (non integrated) / Enerflo (EnFin Finance TPO)

Additional information can be found in: EnFin Resources

Design Platform: Aurora

Property Types ๐Ÿ˜๏ธ๐ŸŒž
Type
Finance
EQ-Op
Duplexes
โœ”๏ธ
โœ”๏ธ
Triplexes
โœ”๏ธ
โœ”๏ธ
1-4 Unit Multifamily Homes
โŒ
โŒ
Condos
โœ”๏ธ
โœ”๏ธ
Townhomes
โœ”๏ธ
โœ”๏ธ
Vacation Homes
โœ”๏ธ
โœ”๏ธ
Secondary Homes
โœ”๏ธ
โœ”๏ธ
Mobile Homes
โŒ
โŒ
In a mobile home park
โŒ
โŒ
Manufactured Homes
โŒ
โŒ
Modular Homes
โŒ
โŒ
Farms/Agricultural Land
โœ”๏ธ
โœ”๏ธ
Investment Properties
โœ”๏ธ
โœ”๏ธ
Commercial Properties
โœ”๏ธ
โœ”๏ธ
5+ Unit Multifamily Homes
โœ”๏ธ
โœ”๏ธ
Roof must be owned, not shared
โœ”๏ธ
โœ”๏ธ
Mulitiple System Financing
โœ”๏ธ
โœ”๏ธ
Ground Mount
โŒ
โŒ
Residential, Single Family Homes
โŒ
โŒ
Detached Garage / Guest Suite
โŒ
โŒ
Accessory Dwelling Unit (ADU)
โŒ
โŒ
Carports / Pergolas
โŒ
โŒ
Overhang Porches
โŒ
โŒ
ย 
Add on Systems ๐Ÿ โšกโž•
Are add-on systems allowed? (Additional panels tied into the same inverter & meter)
โŒ Not acceptable
Are second (2nd) systems allowed? (New system containing new inverter(s), tied to the same meter. A 2nd system, physically separate from any pre-existing solar on site, but tied to the same meter/account)
โŒ Not acceptable
Are separate systems allowed? (A separate/new system connected to a different electric meter, on a different utility account, unrelated to any existing solar systems)
โœ”๏ธ Acceptable
Special Requirements: 1. Existing System Size (kW DC) / 2. Interconnection Method (including breaker size if applicable) / 3. Existing System is isolated from all EnFin equipment / 4. Systems are monitored separately / 5. When installing 2 Enphase systems line filters must be used

Notes:

*Second systems must include a Tesla inverter if you add any Enphase inverter an adder of $650 will apply.

โš ๏ธ As the installer, we reserve the right to accept or decline any project described in this section that may involve the modification or intervention of a previously installed system, or that may result in non-compliance with any of the standards established by the financing company.

ย 
Pricing Details ๐Ÿ’ฐ
Minimum amount
$10.000
Maximum amount (total)
$125.000
Price Per Watt (PPW) Cap
PV Only: $0.07โ€“$0.22 per kWh PV + ESS: $0.10โ€“$0.31 per kWh Max Escalator: 3.5%
Customer Requirements ๐Ÿ‘ค
Borrower must be a resident
โœ”๏ธ
Minimum FICO requirement
620
Reporting bureau
Transunion
Initial credit verification
Soft
Income Verification
Depends on Credit Report
Co-signer allowed?
Yes, Both applicants must meet the minimum credit requirements
Credit Freeze
Unfreeze Transunion
Reverse Mortgage
โŒ
DTI
Yes
ITIN (Individual Taxpayer Identification Number)
โœ”๏ธ
System Requirements โšก
Maximum System Size
45 kW
% Offset
Up to Utility Discretion
Roofing Information ๐Ÿ 
โŒ Excluded Roofs
Excluded roof type. โ€“ Wood Shake โ€“ Cal Shake โ€“ Slate Tile โ€“ Metal Shingle โ€“ Copper - Copper - Exotic Metals
โŒ Disqualified / Excluded / Restricted Roofs
โ€“ Wood Shake โ€“ Cal Shake โ€“ Slate Tile โ€“ Metal Shingle โ€“ Copper
The only requirement is that you would need to use a racking system from our AVL that is compatible with this roof type & install it to manufacturer specifications.
โœ”Clay
Credit Extension ๐Ÿ“Š
Credit Expires
Before Contract is Signed: Credit expires 30 days from the application submission date. After Contract is Signed: Credit expires 180 days from the application submission date.
Allows Extension
Extensions for this 180-day expiration are assessed on a case-by-case basis, and it is expected that any potential delays are communicated in advance
Extension Expires
Yes. Must contact EnFin at minimum 2 weeks before credit expiration. Case by Case and can only request 30 day extensions at a time.ย ys. extra 30 days. Must be requested within 10 days of original expiration
Max Number of Extensions
1
Debt Requirments ๐Ÿ“‹
Bankruptcies
โŒ Not disclosed
Foreclosure
โŒ Not disclosed
Funding Details ๐Ÿ’ธ
First Payment Date
After the project reaches PTO, H/O can expect payment roughly 2 months of PTO completion.
NTP (Notice to Proceed) Timeline
3-5 Days
Funding Timeline
1-3 business days
M1 Commission By Equity Solar
โœ”๏ธ
Loan Transferability
โœ”๏ธ
Contract & Verification Process โœ๏ธ
Spanish Agreement?
โŒ
Welcome Call
โœ”๏ธ
Cancellation Policy Timeline
โŒ
Utility Companies ๐Ÿ”Œ
FPL
โœ”๏ธ
Duke
โœ”๏ธ
City of Bartow Electric
โŒ
City of Mount Dora
โœ”๏ธ
City of Vero Beach
โœ”๏ธ
Clay Electric Cooperative Inc
โœ”๏ธ
JEA
โœ”๏ธ
Kissimmee Utility Authority
โœ”๏ธ
Lakeland Electric
โœ”๏ธ
Lee County Electric Coop Inc
โœ”๏ธ
SECO
โœ”๏ธ
TECO
โœ”๏ธ
Glades
โŒ
Withlacoochee
โœ”๏ธ
City Of Winter Park
โŒ
FPUA
โŒ
Orlando Utilities Commission
โœ”๏ธ
Peace River Electric Coop (PREC)
โŒ
City of Tallahassee (Your Own Utilities)
โŒ
Gainesville Regional Utility (GRU)
โœ”๏ธ
ย 

๐Ÿ“ž Financial institution contact information:

  • Welcome Call: (833) 586-3677 โ€“ Select Option 1
  • Contractor Support: (833) 586-3675
  • Customer Service: 717-853-1183
  • Chat & Phone Support Hours: Monday - Friday: 5:00 A.M. to 9:00 P.M. (PT.) / Saturday - Sunday: 7:00 A.M. - 4:00 P.M. (PT.)
Did this answer your question?
๐Ÿ˜ž
๐Ÿ˜
๐Ÿคฉ