Adders

💰 Available Adders ⚡ Here you’ll find all the current adders and options available!

🚨Warning🚨

WARNING All projects located in Palm Beach, Lee County, Hendry, Broward, Miami-Dade, Monroe, and Collier must meet the minimum system size requirement of 8 kW to qualify. For all other states within our coverage area, the minimum required system size is 4.5 kW.

💰 Sales Adders

Panels and Inverters Adders

Remember to check our compatibility guidelines to verify whether the current modules or inverter have any type of adder.

PANELS
ADDER
SILFAB 440W DCA2
$0.0
Q.PEAK DUO BLK ML-G10.C1+/AC 410
$0.0
Mission Solar MSE385
$0.0
INVERTER
ADDER
Tesla Solar Inverter 7.6
$0.0
IQ8HC-DOM-US
$0.0
MODULES+INVERTERS
Fee
MSE385 + Enphase IQ8 PLUS
$0.10 Per Watt
Enphase IQ8 PLUS + QCELLS PANELS
$0.10 Per Watt
Enphase IQ8HC M + QCELLS PANELS
$0.15 Per watt
Enphase Consumption Monitoring
$0
Second system Enphase inverter
$500
Electrical and Battery Storage Adders
ELECTRICAL
Fee
Main Panel Upgrade
$2,500
Flex Metal Attic Run
$0
 
BATTERY STORAGE LEASE (Solar+Battery)
Fee
Enphase 10KW
$14,400
Enphase 20KW
$25,000
Enphase 30KW
$35,000
Enphase 40KW
$42,000
(1) Tesla Power3 - 13.5KW
$12,800
(2) Tesla Power3 - 27KW
$21.800
(3) Tesla Power3 - 40.5KW
$31,800
(4) Tesla Power5 - 40.5KW
$41.800
BATTERY STORAGE LOAN (Solar+Battery)
Fee
(1) Tesla Power3 - 13.5KW
$12,800
(2) Tesla Power3 - 27KW
$21,800
(3) Tesla Power3 - 40.5KW
$31,800
Miscellaneous Adders

These adders are automatically applied, it depends on each project.

MISCELLANEOUS ADDERS
Fee
Extended Area 100 Miles (Office)
$800.00
Pentair Variable Speed Pool Pump 1.5hp
$2,500
Rheem Hybrid Water Heater 50G
$2,695
Rheem Hybrid Water Heater 80G
$3,695
Water Softener
$6,000
Water Softener+ Reverse Osmosis
$7,000
Umbrella Insurance Done for You
$680
Nest Thermostat
$350
Utility Tier 2
$0
County Permit
$350
Remove & Install (shingle roofs only)
$0.50 Per Watt
Size System < 4.5Kw - 7 Kw
$950
Site Survey
$150
Town House
$0.10 Per Watt
Outside Roofer
$500 each
Automatic Adder
Ground Mount, Second System and Roofing Adders
GROUND MOUNT, SECOND SYSTEM& ROOFING
Fee
Ground Mount
$0.55 Per Watt
Trenching (After 50 feet) Per foot feet
$20.00 Each
Flat Roof
$0.10 Per Watt
Concrete
$0.20 Per Watt
Metal Roof
$0.15 Per Watt
Ceramic Tile Roof
$0.25 Per Watt
Roof Penetration Extended Warranty
$0.05 Per Watt

💰 After Sales Adders

Cancellations and Electrical Adders
CANCELATIONS
Fee
Cancelation after engineering
$0
Cancelation after Permit
$0
Cancelation after Truck roll fee
$0
ELECTRICAL
Fee
Relocate Main Services Panel
$0
Sub Panel Swap
$0
PV Breaker Connection
$0
Flex Metal Attic Run
$0
Main Breaker Derate
$0
Line Side Tap Connection
$0
Miscellaneous Adders
MISCELLANEOUS
Fee
Enphase CellCard 5 Yr"(Required for Sunnova)" $350.00
$0 till 12/31/24
Truck Roll Fee
$0
 
Did this answer your question?
😞
😐
🤩