GoodLeap

๐Ÿ–ฅ Your quick reference guide to all GoodLeap financing options. Perfect for fast and accurate proposals.

Notion image

๐Ÿ’ป Log in Link: Login | GoodLeap

Application Platform: Enerflo (integrated)

Design Platform: Enerflo - Aerialytic

Property Types ๐Ÿ˜๏ธ๐ŸŒž
Duplexes
โœ”๏ธ
Triplexes
โœ”๏ธ
1-4 Unit Multifamily Homes
โœ”๏ธ
Condos
โœ”๏ธ
Townhomes
โœ”๏ธ
Vacation Homes
โŒ
Secondary Homes
โœ”๏ธ
Mobile Homes
โŒ
In a mobile home park
โŒ
Manufactured Homes
โŒ
Modular Homes
โŒ
Farms/Agricultural Land
โŒ
Investment Properties
โŒ
Commercial Properties
โŒ
5+ Unit Multifamily Homes
โŒ
Roof must be owned, not shared
โœ”๏ธ
Mulitiple System Financing
โœ”๏ธ
Add-On* (see notes)
โŒ
Ground Mount
โŒ
Residential, Single Family Homes
โŒ
Detached Garage / Guest Suite
โŒ
Accessory Dwelling Unit (ADU)
โŒ
Carports / Pergolas
โŒ
Overhang Porches
โŒ

Notes:

*Second systems must include a Tesla inverter if you add any Enphase inverter an adder of $650 will apply.

Pricing Details ๐Ÿ’ฐ
Minimum amount
$10.000
Maximum amount (total)
$135.000
Price Per Watt (PPW) Cap
$5/watt Max system size: 25KW
System Offset Cap
Max 110% Projects at 111%-150% require a signed Homeowner Acknowledgement Form Above 150% is not permitted
Customer Requirements ๐Ÿ‘ค
Borrower must be a resident
โœ”๏ธ
Minimum FICO requirement
680
Reporting bureau
Experian, Equifax and Transunion
Initial credit verification
Soft
Income Verification
May be required if FICO is less than 700
Co-signer allowed?
Yes, Co-signer does not need to be on title or occupying home. Highest FICO counts
Credit Freeze
No
Reverse Mortgage
โœ”๏ธ
DTI
Does not look at DTI
ITIN (Individual Taxpayer Identification Number)
โœ”๏ธ
Roofing Information ๐Ÿ 
โŒ Disqualified Roofs
Clay, Slate, & Glazed Tile Metal Shingle & Metal Tile Wood Shake & Cal Shake Tar & Gravel Copper Low Slope Roofs
Credit Extension ๐Ÿ“Š
Credit Expires
After 180 Days
Allows Extension
Yes
Extension Expires
After 30 Days. extra 30 days. Must be requested within 10 days of original expiration
Max Number of Extensions
1
Debt Requirments ๐Ÿ“‹
Bankruptcies
๐Ÿšซ Last 4 years
Foreclosure
๐Ÿšซ Last 4 years
Funding Details ๐Ÿ’ธ
First Payment Date
90 Days After Install
NTP (Notice to Proceed) Timeline
1-3 Days
Funding Timeline
2 banking Days
M1 Commission By Equity Solar
โœ”๏ธ
Loan Transferability
โœ”๏ธ
Contract & Verification Process โœ๏ธ
Spanish Agreement?
โœ”๏ธ
Welcome Call
Virtual calls for all applications, telephone calls for ages 65+
Cancellation Policy Timeline
โŒ
Utility Companies ๐Ÿ”Œ
FPL
โœ”๏ธ
Duke
โœ”๏ธ
City of Bartow Electric
โœ”๏ธ
City of Mount Dora
โœ”๏ธ
City of Vero Beach
โœ”๏ธ
Clay Electric Cooperative Inc
โœ”๏ธ
JEA
โœ”๏ธ
Kissimmee Utility Authority
โœ”๏ธ
Lakeland Electric
โœ”๏ธ
Lee County Electric Coop Inc
โœ”๏ธ
SECO
โœ”๏ธ
TECO
โœ”๏ธ
Glades
โœ”๏ธ
Withlacoochee
โœ”๏ธ
City Of Winter Park
โœ”๏ธ
FPUA
โœ”๏ธ
Orlando Utilities Commission
โœ”๏ธ
Peace River Electric Coop (PREC)
โœ”๏ธ
City of Tallahassee (Your Own Utilities)
โœ”๏ธ
Gainesville Regional Utility (GRU)
โœ”๏ธ
ย 

๐Ÿ“ž Financial institution contact information:

  • Welcome Call: No welcome call โ€“ verification via email
  • Contractor Support: (844) 910-0111
  • Customer Service: 1-844-562-6725
Did this answer your question?
๐Ÿ˜ž
๐Ÿ˜
๐Ÿคฉ